POE Shutdown Period "unexpected link change"
Posted: Mon Aug 29, 2016 10:36 am
Hi everyone!
Currently it's still winter where I live and in a remote solar site we have, we've setup Shutdown periods in our WS-12-250-DC for some of our AP's during night hours.
I've also been implementing syslog in my libreNMS (check it out, it's a GREAT project) setup and I found that when I setup Shutdown Periods in the switch I get Unexpected link changes in my logs. Furthermore when I access the switch UI there is a red alert exclamation sign under Device -> Logs, as if there would be a problem which is not the case when you have set up shutdown periods. Could this be fixed and changed to something like "expected link change on port X", removing also the log alert?
Log transcript:
Thanks,
Andrés Rahn.
Currently it's still winter where I live and in a remote solar site we have, we've setup Shutdown periods in our WS-12-250-DC for some of our AP's during night hours.
I've also been implementing syslog in my libreNMS (check it out, it's a GREAT project) setup and I found that when I setup Shutdown Periods in the switch I get Unexpected link changes in my logs. Furthermore when I access the switch UI there is a red alert exclamation sign under Device -> Logs, as if there would be a problem which is not the case when you have set up shutdown periods. Could this be fixed and changed to something like "expected link change on port X", removing also the log alert?
Log transcript:
- Code: Select all
Aug 26 07:00:00 switch[804]: Enabling PoE power on port 6 due to Shutdown Period
Aug 26 07:00:02 Port: link state changed to 'up' (10M-F) on port 6
Aug 26 07:00:02 STP: set port 6 to discarding
Aug 26 07:00:02 switch[862]: unexpected link change on port 6 100M-F
Thanks,
Andrés Rahn.