A Dummies Guide to Off-Grid Netonix DC switches.

User avatar
billbuchan
Member
 
Posts: 85
Joined: Fri Dec 19, 2014 11:52 pm
Location: United Kingdom
Has thanked: 42 times
Been thanked: 34 times

A Dummies Guide to Off-Grid Netonix DC switches.

Tue Jul 25, 2017 3:58 am

So far, all our 100+ access points are on-grid, and UPS protected.

But next week, one of our sites at a wind turbine farm is due to be off for two days. (They burnt through a 4" thick copper cable when it peaked).

So. Lets assume I want an 8 port DC switch, and will attach a couple of AWG batteries to it. What can I do to attach solar panels, or set it up so I can remove an individual battery and take it away for a re-charge on grid.

For instance, do I wire two batteries in parallel, so I can remove a battery? Do I just get a charger/solar panel controller and wire it across the batteries too?

(Real newbie stuff, I know. Sorry)

Any advice gratefully received,

---* Bill

Return to General Discussion

Who is online

Users browsing this forum: Google [Bot] and 24 guests