Hi,

Have you seen a Digital Loggers' Midspan unit....it would be very nice to get something similar, but with Gb ports and VHP 4-pair power as well. Your devices do close, but adding the charging capability and change-over to battery on AC fail would cinch it.

Our remote sites use 24v battery config, and space may make it hard for 48v input, so....that, too.

Re: Midspan

Posted: Thu Jan 11, 2018 4:39 pm
by sirhc
On battery sites use our SMART DC switch which accept 9V-72V DC input
Hook them directly to the battery bank
Then hook chargers to the battery banks - charging units should be sized larger than demand at site.

Re: Midspan

Posted: Thu Jan 11, 2018 6:27 pm
by tuckerdog
Hi,

I guess I will have to learn about VLANs then, as I am fully routed, not using VLANs at this time.

Any good crash-courses available? :^)

Re: Midspan

Posted: Thu Jan 11, 2018 6:29 pm
by tuckerdog
Hi,

Which ones are the smart switches that have that input range?

Re: Midspan

Posted: Thu Jan 11, 2018 6:31 pm
by sirhc
tuckerdog wrote:Hi,

Which ones are the smart switches that have that input range?


WS-8-150-DC
WS-12-250-DC
WS-26-500-DC

Re: Midspan

Posted: Thu Jan 11, 2018 6:36 pm
by tuckerdog
Hi,

Thanks for that.

Now that stupid question....I gather I would set up VLANs for making this work properly, as I have AF24in to a tower, local LAN(s) for the tower, and AF24 out to the next location...? Because this is a switch, and not each port being a pass-through...

Re: Midspan

Posted: Thu Jan 11, 2018 7:56 pm
by sirhc
All this has been discussed many times.

I did a sime search for midspan posts I made
viewtopic.php?f=6&t=1704&p=18294&hilit=mid#p18294


Hear are all posts I made on midspans
search.php?keywords=mid&terms=all&author=sirhc&sc=1&sf=all&sr=posts&sk=t&sd=d&st=0&ch=300&t=0&submit=Search